    Has anyone removed the bulkhead at the back of the passthrough of a 2450RL?

    Hello, I was wondering if anyone had removed the bulkhead on the pass through on a 2450RL. I am considering adding more batteries and was going to remove that panel but wondered if anyone had done so and taken pictures. I'm installing a water filter on the side of the nautilus and realized that is attached over the bulkhead. So I could pull it down but it's flimsy and I don't want to tear it up...

  2. #2
    Fireside Member
    Join Date
    May 2020
    Posts
    60
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    I've found my answer, on this trailer there is no additional space... well there is the gap in between the 1x framing used.

  3. #3
    Rolling Along RV Sailor's Avatar
    Join Date
    Oct 2020
    Location
    Maryland
    Posts
    562
    Mentioned
    5 Post(s)
    Tagged
    0 Thread(s)
    Our 3 Oaisis Firefly Carbon Foam AGM as well as the Victron 3000/12/120 inverter charger located in the pass through behind the water station . Also the Victron 1000 mttp controller for the solar panels located there also.

    https://oceanplanetenergy.com/advanc...asis-group-31/
    Donna and Dave
    Annapolis, Maryland
    2021 Grand Design Imagine 2500RL / Dodge Ram Longhorn 2500 6.4 Hemi
    350 W Newapower Solar: 3000 Victron Inverter/ Charger: Firefly Oasis carbon foam AGM

  4. #4
    Fireside Member
    Join Date
    May 2020
    Posts
    60
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Thanks, that's where I plan on mounting mine. I was trying to find some more space... but there's none to be had. The bed is behind that area, and is where I am moving my batteries.

  5. #5
    Rolling Along RV Sailor's Avatar
    Join Date
    Oct 2020
    Location
    Maryland
    Posts
    562
    Mentioned
    5 Post(s)
    Tagged
    0 Thread(s)
    The panel is so flimsy we put an additional plywood board ( panel) to mount the Victron as well as additional bus bars, on off switches, etc. we attached the board to the panel with detachable latches. This allowed me to do some of the installation on the board before putting it in place. It’s detachable with latches should I ever need to get behind that side of the pass through for maintainence. We are crest adding a few vertices detachable posts in front of this so no stray piece of equipment hits it accidentally.

    These two are excellent in installing . There are many diagrams. This one is easily modified from 50 to 30 amp. It gives you an idea of the equipment you might need as well as fusing. Our solar controller is also on this board with direct connect to the batteries.

    https://www.victronenergy.com/blog/2...erter-charger/

    https://images.app.goo.gl/GwUN3qdHBs1upuLb9
    Donna and Dave
    Annapolis, Maryland
    2021 Grand Design Imagine 2500RL / Dodge Ram Longhorn 2500 6.4 Hemi
    350 W Newapower Solar: 3000 Victron Inverter/ Charger: Firefly Oasis carbon foam AGM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

DISCLAIMER:This website is not affiliated with or endorsed by Grand Design RV, LLC or any of its affiliates. This is an independent site.