Build time
So we ordered a new 370DV the end of January and our dealer told us it would come off the production line around the end of March then go to get full body paint, after that it would be shipped.
Two questions about the build process:
1) How long does it take from step one until it comes of the line? How long is the actual manufacturing process?
2) We are having the independent suspension installed from the factory, do they do that on the line or is it sent over to MORyde after its built to have it changed?
Thanks!!
-
03-08-2024, 06:57 AM #2
- Join Date
- Jul 2014
- Location
- Wherever...
- Posts
- 9,126
- Mentioned
- 191 Post(s)
- Tagged
- 0 Thread(s)
@huntr70 can probably answer your questions more accurately. From our visit to the factory several years ago, the actual build process takes a few days (less than a week). As far as I know, the IS is still installed at the MORryde facility in town - but things may have changed since we had ours done.
RobU.S. Army Retired
2012 F350 DRW CC LB Lariat PS 6.7
2020 Solitude 310GK-R, MORryde IS, disc brakes,
Sailun LRG tires, solar, DP windows, W/D
(Previously in a Reflection 337RLS)
Full time since 08/2015
-
03-08-2024, 07:00 AM #3
- Join Date
- Jan 2024
- Posts
- 6
- Mentioned
- 0 Post(s)
- Tagged
- 0 Thread(s)
Thanks! I was just thinking it was a waste to build it with the standard suspension only to have MORyde cut them all off a week later.....
-
03-08-2024, 07:02 AM #4
- Join Date
- Jul 2014
- Location
- Wherever...
- Posts
- 9,126
- Mentioned
- 191 Post(s)
- Tagged
- 0 Thread(s)
U.S. Army Retired
2012 F350 DRW CC LB Lariat PS 6.7
2020 Solitude 310GK-R, MORryde IS, disc brakes,
Sailun LRG tires, solar, DP windows, W/D
(Previously in a Reflection 337RLS)
Full time since 08/2015
-
03-08-2024, 12:15 PM #5
- Join Date
- Sep 2013
- Location
- PA
- Posts
- 4,516
- Mentioned
- 240 Post(s)
- Tagged
- 0 Thread(s)
From what I was told, GD orders the frame from Lippert when a retail order is taken, and they go directly to MorRyde for the independent install before ever going to the GD plant.
The actual time is a matter of days. The scheduling and waiting for paint is the slow part.
If it is schedule to be offline end of March, the dealer should have it by the end of April.Steve- Inventory Manager at Tom Schaeffer's RV, Shoemakersville, PA www.tomschaeffers.com
[email protected]
2011 RAM 3500 SRW Outdoorsman Edition 4X4, 6.7 Cummins--TWEAKED!
2021 Reflection 310RLS
-
03-09-2024, 02:29 PM #6
- Join Date
- Jul 2020
- Location
- New Hampshire
- Posts
- 2,442
- Mentioned
- 32 Post(s)
- Tagged
- 0 Thread(s)
Robin & John
2020 Ram 3500 LB SRW 4WD Crew Laramie 6.7HO Aisin, 55gal Titan 4014 payload
2022 Solitude 310GK-R - Dual pane, factory solar & Onan, 8K axles with discs, 18K GVWR, W/D, Heat Pump, Goosebox, Battleborn
2023 stays
-
03-11-2024, 05:12 AM #7
- Join Date
- Sep 2013
- Location
- PA
- Posts
- 4,516
- Mentioned
- 240 Post(s)
- Tagged
- 0 Thread(s)
Steve- Inventory Manager at Tom Schaeffer's RV, Shoemakersville, PA www.tomschaeffers.com
[email protected]
2011 RAM 3500 SRW Outdoorsman Edition 4X4, 6.7 Cummins--TWEAKED!
2021 Reflection 310RLS
-
03-11-2024, 05:19 AM #8
- Join Date
- Jan 2024
- Posts
- 6
- Mentioned
- 0 Post(s)
- Tagged
- 0 Thread(s)
Well, received and update from the dealer this weekend and our unit should be rolling of the line the end of this week and should be at the dealership mid April. We were planning on early to mid May so this is a good surprise!
Water leaking
Today, 08:43 AM in Plumbing and Water Systems